Nusa Cemerlang Epoxy Floor Coating

 

Installation of epoxy floor coating before moving in. Floor surface preparation and coating installation, whole process within one week. The owner now can moved in and start their production operation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Posted in Industrial.

Leave a Reply